Made in
EU
Microbrewery Equipment - € Pricelist
2012
|
|
Module 1: BREWHOUSE Module 2: FERMENTING & STORAGE Module 3: INSTALLATION & STARTUP Engineering, installation, training beer recipes Module 4: OPTIONALS Modules 1+2+3+4 together
are forming |
How to use this pricelist: i.e. select Brauhaus 500 ( 5 HL)
A microbrewery consisting of a brewhouse ”BH 500” + Fermenting &
storage “GK50.000” (for 50.000 litres of
Pils/Lager or up to 100.000 litres of Ale or Weizen), space requirements: for the brewhouse
min. 12 m², for the fermenting and storage room min. 25 m², for malt storage
10-20 m². This brewery is expandable up to
200.000 l/y.
Modules 1+2+3 ( basic fully functioning brewery ) will cost (without optionals
acc. to module 4) a total of EURO 198.000,-
Next Project actions:
Ask for a detailed offer ● send building drawings ● visit our
demonstration brewery
● test our beers ● finalization of
a contract ● prepare building ● delivery of equipment
● installation ● brewmaster training at site ● brewing
● opening of Pub
Module 1: BREWHOUSE
turnkey equipment 3-vessel brewhouse
including electrical heating and semi-automation
Duration per brew approx. 6-8 hours.
|
select |
Brauhaus |
capacity |
place requirement brewhouse |
normal annual capacity |
expandable |
price in |
|
r |
BH 300 |
3 |
9 |
30.000 – 60.000 |
120.000 |
71.000,- |
|
r |
BH 500 |
5 |
12 |
50.000 – 100.000 |
200.000 |
109.000,- |
|
r |
BH 1000 |
10 |
15 |
100.000 – 200.000 |
600.000 |
144.000,- |
|
r |
BH 2000 |
20 |
20 |
300.000 – 600.000 |
1.200.000 |
188.000,- |
Module
2: FERMENTING & STORAGE
All necessary tanks with cooling system , each tank
insulated. Suitable for 3 kinds of beer. The capacity depends on kind(s) of
beer ( i.e. Pils or Lager – production time: 3-4 weeks // Wheat or Ale - production
time: 2 weeks) . The final annual capacity depends on the actual production
scheme.
|
select |
ferment/storage |
place requirement |
suitable for annual capacity |
number of tanks x litres |
price in |
|
r |
GK
30.000 |
20 |
30.000
– 60.000 |
4
x 600 |
44.000,- |
|
r |
GK
50.000 |
25 |
50.000 – 100.000 |
|
62.000,- |
|
r |
GK 100.000 |
30 |
100.000 – 200.000 |
|
89.000,- |
|
r |
GK 150.000 |
40 |
150.000 – 300.000 |
|
122.000,- |
|
r |
GK 200.000 |
50 |
200.000 – 400.000 |
|
157.000,- |
|
r |
GK 300.000 |
70 |
300.000 – 600.000 |
12 x 2000 |
181.000,- |
|
r |
GK 600.000 |
100 |
600.000 – 1.200.000 |
12 x 4000 |
293.000,- |
Module 3:
INSTALLATION & STARTUP
preinstallation with complete stainless steel piping
of beer lines, lead installation, brewers training at site, 3 beer recipes.
|
Service package |
BH 300 |
BH 500 |
BH 1000 |
BH 2000 |
|
|
|
Per brewery installation |
18.000,- |
27.000,- |
33.000,- |
44.000,- |
Module
4: OPTIONALS ( please select!)
possible additional equipment for higher comfort or
capacity increase , design elements and materials. The prices mentioned here
are valid in combination with a complete brewery only.
|
4.1 Technical
Options |
BH 300 |
BH 500 |
BH 1000 |
BH 2000 |
|
|
4.1.1 |
Rake unit with knives for lauter tun |
6.500,- |
included |
included |
included |
|
4.1.2 |
Heating with gas or oil (instead of electrical) Without
tank and chimney |
6.900,- |
9.800,- |
10.700,- |
15.800,- |
|
4.1.3 |
Integration of existing heating systems SOLAR / gas / oil / wood / steam |
4.000,- |
5.000,- |
7.000,- |
9.000,- |
|
4.1.4 |
Extra console f. notebook |
1.900,- |
1.900,- |
1.900,- |
1.900,- |
|
4.1.5 |
Barrel cleaning system, autom. 12 KEG/h |
6.300,- |
6.300,- |
6.300,- |
6.300,- |
|
4.1.6 |
Bottle filler automatic, 4 heads |
6.200,- |
6.200,- |
6.200,- |
6.200,- |
|
4.1.7 |
Bottle filler automatic, 8 heads |
7.900,- |
7.900,- |
7.900,- |
7.900,- |
|
4.1.8 |
Combi-package of KEG cleaner + bottle filler 4 h |
9.500,- |
9.500,- |
9.500,- |
9.500,- |
|
4.1.9 |
Beer
filter |
4.800,- |
11.200,- |
11.200,- |
20.200,- |
|
4.1.10 |
CO2-alarmsystem |
500,- |
500,- |
500,- |
500,- |
|
4.1.11 |
“next-brauhaus”® - Full automation
system |
n/a |
25.000,- |
28.000,- |
32.000,- |
|
4.1.12 |
Water piping stainless steel for brewhouse |
2.500,- |
3.700,- |
4.500,- |
5.600,- |
|
4.1.13 |
Manual forklift f. installation +
malt/KEG handling |
1.100,- |
1.100,- |
1.100,- |
1.100,- |
|
4.1.14 |
Spare part package for two years |
1.500,- |
1.800,- |
2.200,- |
3.500,- |
|
4.2 Design
Options |
BH 300 |
BH 500 |
BH 1000 |
BH 2000 |
|
|
4.2.1 |
Copper domes
(top) f. 3-vessel brewhouse |
4.500,- |
6.500,- |
8.200,- |
12.500,- |
|
4.2.2 |
Copper
cladding zylind. f. 3-vessel brewhouse |
4.500,- |
5.200,- |
5.700,- |
9.500,- |
|
4.2.3 |
Stage element f. brewhouse ( 2 or 3
steps ) |
1.900,- |
2.100,- |
2.500,- |
3.500,- |
|
4.3 Expansion Options |
BH 300 |
BH 500 |
BH 1000 |
BH 2000 |
|
|
4.3.1 |
Expansion module (2nd brew kettle ) |
25.000,- |
30.000,- |
35.000,- |
41.000,- |
|
4.4 Beer serving Options |
|
|
|
4.4.1 |
Beer serving tank 650 litres, including
integration into cooling system, beer hose, beer pump, drafting tower,
installation. suitable also for in-liners. |
6.700,-/ pc |
|
4.4.2 |
Beer serving tank 1100 litres, including
integration into cooling system, beer hose, beer pump, drafting tower,
installation. suitable also for in-liners. |
8.900,-/pc |
|
4.4.3 |
25 litres KEG, stainless steel with flat
fitting |
95,-/pc |
|
4.5 Other Options |
|
|
|
4.5.1 |
Raw materials for brewing: malts, hops,
yeasts |
0,25 EURO per
litre/beer |
|
4.5.2 |
Transport from Ex-works to final
destination including insurance, depending on brewery size and destination |
inquiry |
Above prices are on the basis of ex works (EXW according INCOTERMS 2010) in
EURO excl. VAT or Customs duty, valid until 30.06.2012. 1 turn key brewery =
MODULE 1+2+3+4. Delivery: approx. 3-4 months ex works.